sched-deps.c
134 KB
-
revert: re PR rtl-optimization/57268 (c nested loops hang compiler in sched-deps.c) · 21759881
2013-06-01 Dinar Temirbulatov <dinar@kugelworks.com> Revert PR rtl-optimization/57268 * sched-deps.c (sched_analyze_2): Flush dependence lists if the sum of the read and write lists exceeds MAX_PENDING_LIST_LENGTH. From-SVN: r199576
Dinar Temirbulatov committed